Middle Tier of Acquisition (MTA)

AAF  >  MTA  >  Resources

MTA Resources

How To Use This Site

Each page in this pathway presents a wealth of curated knowledge from acquisition policies, guides, templates, training, reports, websites, case studies, and other resources. It also provides a framework for functional experts and practitioners across DoD to contribute to the collective knowledge base. This site aggregates official DoD policies, guides, references, and more.

DoD and Service policy is indicated by a BLUE vertical line.

Directly quoted material is preceeded with a link to the Reference Source.

MTA Courses

DAU MTA Policy Takeaways

  • See Slide 39 of DAU MTA Rapid Deployment Training (RDT) webinar, 31 March 2020

Read more

Important Policy takeaways. 1) MTAs can be used for MDAPs. NO limitation on size or scope currently exists; however, USD(A&S) written approval needed for those exceeding MDAP threshold. SAR-like reporting also required. 2) MTAs are not required to use OTAs. MTAs can use OTAs, but OTAs are just one tool in the contracting toolbox 3) Rapid fielding is independent of rapid prototyping. Can transition from rapid prototyping to rapid fielding, but can also start with rapid fielding 4) Both rapid prototyping and rapid fielding are limited to 5 years. Neither rapid prototyping nor rapid fielding can exceed five years so can’t take 7 years for rapid prototyping, followed by 3 years of rapid fielding. 5) Each program is unique. There are no checklists; critical thinking is required to determine what makes sense for your program. 

MTA Templates
MTA Program Execution Resources
MTA Videos

Note: If the below video(s) show a “Website Blocked” banner, try accessing the video via a non-DoD network. No sensitive content is contained in this video. Current DoD network policies to conserve bandwidth may be impacting the ability to view this video.